Technological connection procedure of constructing object to utility networks, tariffs, prices
Connection of a capital construction object to the networks of engineering and technical support is carried out under the contract. Procedure of conclusion and execution of stated contract, essential conditions of such contract, the rights and obligations of the parties are determined in accordance with the legislation of the Russian Federation.
- Stages of connection to the networks of engineering and technical support
- The procedure of technological connection to the gas supply networks
- The procedure of technological connection of an object under construction to the water supply networks, drainage system and waste-water treatment
- Procedure of technological connection to the electric grids
- Procedure of technological connection to heat supply networks
- The list of network organizations for connection of object under construction (reconstruction) to the electrical network